- The path to access the module is as shown below.
- Project Manager/ WHM will upload the material to be received at site from warehouse via Uploader available in web portal in the below template format.
- Note, all fields in the uploader template are mandatory to fill.
- Material visibility against the site will be on the basis of site category, please find the details below.
Site Category
Name of Equipment |
Solar + EB | Solar + DG | EB + DG |
Li-ion Battery | Yes | Yes | Yes |
Hybrid CCU | Yes | Yes | No |
SMPS | No | No | Yes |
Solar Panel & Structure | Yes | Yes | No |
ACDB | Yes | No | Yes |
CCTV Camera | Yes | Yes | Yes |
75 Kgs ABC Type Fire Extinguisher | Yes | Yes | Yes |
Twin Aviation Light | Yes | Yes | Yes |
LED Flood Light | Yes | Yes | Yes |
- Note: – Site ID and Equipment Name should exist in the system for the upload transaction to get success.
- Once the equipment detail is successfully uploaded, details of material to be received at site (STN) will be visible to the Site Engineer in mobile app and initial status of the transaction will be “Awaiting dispatch”